Welcome To b2b168.com, Join Free | Sign In
中文(简体) |
中文(繁體) |
Francés |Español |Deutsch |Pусский |
| No.13638194
| No.13638194
- Product Categories
- Friendly Links
| Information Name: | Chengde TS16949 | Chengde TS16949 consulting firm | AS9100 |
| Published: | 2015-06-23 |
| Validity: | 0 |
| Specifications: | Any |
| Quantity: | |
| Price Description: | |
| Detailed Product Description: | What is the quality of the development of quality guidelines: it is easy to understand; it challenging; linked to the target and performance (including quality objectives), suitable for the application, security, and reliability; considering cost minimization; based on the appropriate level of management of quality objectives; to provide adequate resources to achieve the objectives; identify and provide the necessary training; control all activities affecting quality; emphasis on prevention; indicate the methods used and standards to be achieved. The business is about the purpose of a corporation or a contribution to social development should make a statement, Chengde TS16949, sometimes referred to as corporate mission. The significance of the import process method implementation of quality management system and the adoption of a process approach when improving the effectiveness of the quality management system, Chengde TS16949 consulting firm purpose is to satisfy customer requirements and enhance customer satisfaction. Advantages of the process approach is a combination of process systems as well as individual processes contact and interaction process control. TS16949 system in the process of establishing and implementing common problems 08 8.3 Chapter prone to question 1, substandard material has not been identified or placed in an unspecified place; 2, there is no review and rework process defined responsibilities; 3, does not require rework requirements ; 4, repair or rework no recheck. 8.4 Chapter prone to question 1, when there is no need for data analysis; 2, analysis method is invalid; 3, no data collected human use. 8.5 Chapter prone to question 1, written corrective action plan has not been implemented; 2, corrective / preventive actions are not assigned duties; 3, there is no formal plan preventive measures, Chengde TS16949 certification consulting, in particular, deal with product and process development; 4 , stressing that "Questions" is better than prevention and continuous improvement; 5, prevention of product failures recurring insufficient ability; 6, only the application of corrective measures prevent recurrence of the failure, there is no practical preventive measures to prevent the problem does not occur in the application (such as, is not applied correctly FMEA). |
Admin>>>
You are the 21740 visitor
Copyright © GuangDong ICP No. 10089450, Kyushu aspect Management Consulting (Beijing) Co., Ltd. Hengshui Branch All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility
You are the 21740 visitor
Copyright © GuangDong ICP No. 10089450, Kyushu aspect Management Consulting (Beijing) Co., Ltd. Hengshui Branch All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility

