Welcome To b2b168.com, Join Free | Sign In
中文(简体) |
中文(繁體) |
Francés |Español |Deutsch |Pусский |
| No.13638194
| No.13638194
- Product Categories
- Friendly Links
| Information Name: | Langfang Langfang TS16949_AS9100 TS16949 consultant _ |
| Published: | 2015-06-23 |
| Validity: | 0 |
| Specifications: | Any |
| Quantity: | |
| Price Description: | |
| Detailed Product Description: | Terms and definitions for the automotive industry, a technical specification of the purpose, Langfang TS16949 consultant for ISO9000: 2005 and the following terms and definitions given. 3.1.1 Control Plan for the process control system and the formation of the required product file. 3.1.2 The organization has a design responsible organization have permission to build a new, or change an existing product specification. Note: The duties included in the range specified by the customer application, Langfang TS16949 consulting company, test and validate design performance. 3.1.3 error proofing to prevent the manufacture of defective products and conduct product design and development and manufacturing processes. 3.1.5 laboratory facility for inspection, test or calibration, Langfang TS16949, may include but are not limited to, chemical, metallurgical, dimensional, physical, electrical or reliability testing. 3.1.5 laboratory scope controlled document include: - Laboratory qualified to carry out specific tests, evaluation and calibration; - list of equipment used for these activities, and - the list of activities for the above methods and standards. TS16949 system in the process of establishing and implementing common problems 07 8.2.2 Chapter prone to question 1, according to the elements of the audit, rather than the review process approach; 2, there is no audit system; 3, the audit found that no corrective action is taken; 4 Use auditors did not adequately trained; 5, no independent personnel to perform the audit; 6, documents and records are incomplete. 8.2.3 Chapter prone to Question 1, if necessary, without the application of statistical techniques; 2, the application of statistical methods ineffective; 3, ineffective application sampling systems; 4, improper exert too much control. 8.2.4 Chapter prone to question 1, to accept the lack of control materials (eg required test / inspection of the material directly to the stock); 2, assigned to the production of the material does not identify, has not been fully control; 3, the designated inspection or testing is not performed; 4, examination or test records are missing; 5, final inspection or testing is bypassed, or the company's products approval process is not executed; 6, rework the product does not completely re-examination. Terms and definitions 2 3.1.6 manufacture automotive industry to manufacturing or processing process: - Production of raw materials; - production or service parts; - assembly, or - heat treatment, welding, painting, plating or other surface treatment services. 3.1.7 Predictive maintenance based on process data, aims to predict failure modes that may occur to avoid maintenance issues activity. 3.1.8 preventive maintenance measures to eliminate equipment failure and unplanned production interruptions and planning reasons, it is a manufacturing process design output. 3.1.9 premium freight costs or expenses incurred beyond the contract to deliver outside. Note: It may be due to the method, quantity, unscheduled or late deliveries caused by. 3.1.12 special characteristics that may affect product safety or regulatory compliance, product features or manufacturing process parameters for subsequent processing assembly, function, performance or product. |
Admin>>>
You are the 21740 visitor
Copyright © GuangDong ICP No. 10089450, Kyushu aspect Management Consulting (Beijing) Co., Ltd. Hengshui Branch All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility
You are the 21740 visitor
Copyright © GuangDong ICP No. 10089450, Kyushu aspect Management Consulting (Beijing) Co., Ltd. Hengshui Branch All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility

